Sustainable Transportation Grant Project for Affordable Housing - Phase 2
The work generally consists of the installation of concrete sidewalk panel replacement/grinding, five (5) new curb ramps and two (2) new Rectangular Rapid-Flashing Beacon (RRFBs) along Pueblo Avenue. Installation of concrete sidewalk panel replacement/grinding, and driveway replacement/conform on Old Soscol Way. Installation of ten (10) new Rectangular Rapid-Flashing Beacon (RRFBs) along the bike path stretching from California Avenue to Vallejo Street.
Specifications
(click to expand/collapse)
Name | Size | ||
NTB - Sustainable Transportation Grant Project - Phase II | 1.4 MB | ||
ST21PW06_Specs-SIGNED | 3.9 MB |