Sustainable Transportation Grant Project for Affordable Housing - Phase 2
The work generally consists of the installation of concrete sidewalk panel replacement/grinding, five (5) new curb ramps and two (2) new Rectangular Rapid-Flashing Beacon (RRFBs) along Pueblo Avenue. Installation of concrete sidewalk panel replacement/grinding, and driveway replacement/conform on Old Soscol Way. Installation of ten (10) new Rectangular Rapid-Flashing Beacon (RRFBs) along the bike path stretching from California Avenue to Vallejo Street.
    
    
    
    
    
    
    
            
                                                Addendum 1
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | |||
| Addendum No 1 | 124.7 KB | 

