Vine Trail Gap Closure - Soscol Avenue Corridor ST18PW08
The work generally consists of removing and constructing sidewalk, curb and gutter, constructing a hot mix asphalt multi-use trail, adjust utilities to grade, relocating water utilities, installing streetlights, installing railroad signal system, signing and striping.
Status
Bidding Closed
| Prebid Date | 4/13/21 10:00am |
| Bid Date | 4/27/21 3:00pm |
Company & Contacts
City of Napa
Rosa Corona
rcorona@cityofnapa.org
Location
City of Napa
Engineer’s Estimate: $1,140,000.00

