State Route 29 Bicycle and Pedestrian Undercrossing Project, BP12PW01
The work generally consists of construction of mixed-use pedestrian and bicycle facilities to provide a pathway crossing under State Route 29 at post mile 11.67 between Coffield Avenue on the west and California Boulevard on the east. A series of retaining walls shall be constructed: one with conventional spread footings on the west of State Route 29, and one grouted tie-back wall below the existing highway structures.
Addendum 1
(click to expand/collapse)

Name | Size | |||
ProjectAddendum1 | 6.2 MB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
ProjectAddendum2 | 414.6 KB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
ProjectAddendum3 | 770.1 KB |
Addendum 4
(click to expand/collapse)

Name | Size | |||
ProjectAddendum4 | 9.8 MB |
Addendum 5
(click to expand/collapse)

Name | Size | |||
ProjectAddendum5 | 1.4 MB |