The work generally consists of pavement restoration of approximately 1,800 liner feet of roadway, which includes full digouts and restoration of the majority of the travel lanes and a grind and overlay of the entire surface. The finished pavement markings will be restriped with thermoplastic. The project also includes upgrades to the intersection traffic cameras, minor concrete sidewalk repair and replacement of an existing steel railing over the creek north of Trower Ave.