Traffic Calming and Safety Improvements at Trail Crossings- City of Napa ST21PW06

The work generally consists of the installation of concrete sidewalk panel replacement/grinding, five (5) new curb ramps and two (2) new Rectangular Rapid-Flashing Beacon (RRFBs) along Pueblo Avenue. Installation of ten (10) new Rectangular Rapid-Flashing Beacon (RRFBs) along the bike path stretching from California Avenue to Vallejo Street.
Plans (click to expand/collapse)
Name Size
ST21PW06_Plans-SIGNED 5.0 MB