Yajome Sidewalk Repair Project - (SW23PW01)

The work generally consists of sidewalk repair and construction of a new concrete driveway and reinforced concrete car port. Additionally, two mature trees are to be removed.
Plans (click to expand/collapse)
Name Size
BID-Set-SW23PW01-2023-04-18 1.9 MB